Visits Huang Sheng Guan
May 11, the national network media reporter went to the Sichuan earthquake-stricken areas to see the development of coverage group and his entourage arrived into Lan railway Huang Sheng Guan. -Lanzhou railway is located in the territory of Sichuan, and Gansu provinces, "5.12" Wenchuan earthquake reconstruction focus of public service transport infrastructure projects, when completed, to form a green life rescue for improving the disaster area transportation conditions, and promote along socio-economic development have a positive effect.
It is reported that the Chengdu-Lanzhou railway speed of 200km / h passenger and freight line a railway line is located in Sichuan and Gansu Province, from the station in Chengdu Qingbaijiang, Shifang, Mianzhu County, Maoxian, Songpan Jiuzhaigou north extension connection the Hadapu Jian Lan-Yu Railway Station, the line length 457.621km, Sichuan Province is building about 369.186km (Aba range 272.984km Maoxian 79.494km, Songpan County 113.988km, Jiuzhaigou County 79.502km), Gansu construction of the territory is about 88.435km. National Development and Reform Commission approved the total duration of 6 years (including the FBI testing and commissioning and trial operation). The total investment of the National Development and Reform Commission approved the feasibility study to estimate the total amount of 63.6 billion yuan, 61.5 billion yuan of project investment, rolling stock acquisition costs of 2.1 billion yuan.
Full range of new bridges 120 a total of 80584.142 meters, which is line bridge 80, the total length of 62.37km, accounting for 13.63% of the full range of total length; 33 tunnels of total length of 332.438km, accounting for 72.65% of the full range of line length; across the board the longest tunnel in peace long tunnel 28.427km. Subgrade earthwork total of 27.37 million cubic meters, the positive line to the laying of double-block non-ballasted track 285.607km line laying 919.506km, station line laying 91.92km, demolition of buildings 391110 square meters, and 11659 acres of land. Along a total of 18 stations, including New Sanxingdui, West Shifang, Mianzhu South County, Gao Chuan, Maoxian, Tong, Tai Ping, Zhenjiang off Songpan, Chuanzhusi, Huang Sheng Guan, big catalogs, Jiuzhaigou , Dole, Lazikou 16 stations, renovation of existing Qingbaijiang and station under construction Hada Shop. Laying in Qingbaijiang Hada t beam precast plant.
By the end of April 2012, the pre-start three tenders to complete the temporary rent to 579.43 acres, or 60.9 percent of the total; red line, 1629.46 acres of land, 58.88% of the total. The major physical works volume completion: early start segment totaled 41 Articles of the roadbed earthwork; bridge 4396.75 Bridge; 112.86 into the tunnel hole m; culvert 744.48 horizontal linear meters. The total completed investment of 479.7 million yuan, which Jian'an completed an investment of 223.41 million yuan, land acquisition and other 256.29 million yuan. The which clzq-6-1 standard cumulative completion of the bridge 194.25 Bridge, Tunnel 112.86 into a hole m, culverts 49.08 horizontal linear meters, 2.6 Articles roadbed, and Chien completed an investment of 41.99 million yuan. Source: Sichuan News Network