It is reported that the specific time for traffic control until November 30, 2011 24 pm. Control period, the large, medium and small passenger vehicles, one way to implement sub-release. Among them, all goods vehicles 19 hours a day to the next day from 7 am only, one-way release, the rest closed to traffic. From Leshan to the horse side of the vehicles can detour via State Road 213 Mu (Chuan) yellow (Dan) bypass road to the Lok Ma edge or to Qian Wei Yi Expressway, the Mu (Chuan) yellow (red) to the horse side of road from muchuan . Ju slot to and from their Sandy Bay, Sandy Bay Guri vehicles to bypass music (Hill) Mindanao (brow) road by the Soviet Union (JI) sand (Beach) Road to Sandy.
In addition, by the aftershocks and the "814" large flash floods and other disasters of debris flow, State Road 213 Dujiangyan to Yingxiu Zipingpu highway tunnel, the tunnel and Longxi Tunnel Cave sub-road, drainage system, severely damaged, has threatened in the past safe passage of vehicles, building owners now have the conservation of the Treatment section. It is reported that maintenance works will be on July 24 ended on 24 points, during the Dujiangyan to Yingxiu Highway one-way traffic. The Chengdu Dujiangyan to Yingxiu upstream passage of vehicles, Yingxiu to Dujiangyan, the direction of vehicles pass through the tunnel floor fires, Yingxiu, whirlpool mouth to Dujiangyan . Line from the State Road 213 northwest into the Aba large (heavy) goods vehicles Bypass Chuanzhusi - Jiuzhaigou - Ping Wu - Chengdu.