Healthy Green Road, Riverside Road Riverside Road following the completion of road improvement, Chengdu, Huimin started another project, mainly related to Jin Jiang build and landscape the green side of upgrades. It is located between Riverside Road and Jinjiang, Chengdu is the only one downtown waterfront greenway health. Yesterday, the reporter Binjiangxilu, Riverside Road, see, for paving the quartzite has been delivered to the scene, Riverside Road, Green Road, part way along the model segment has Qi Hao, the workers working on planting trees.
According to the construction announcements, Riverside Road, Healthy Green Road will be completed by the end of 4.
Features a quartzite floor tiles Ginkgo
Green Road, Binjiang Road health plan was finalized last year, to the construction from the start, has always been of concern.
Yesterday afternoon, reporters from the old South Gate Bridge on foot to the Binjiangxilu, Binjiang Road, Jinjiang side of being hit around by the construction of Riverside Road from the direction to the Jiuyanqiao, Green Road, excavation and road construction in the road along the hermitages stage. Jinjiang in Binjiangxilu bridge, the road through the formation of excavation, but also a new tall ginkgo trees planted. Playing Weidang board, the quartzite tiles have just arrived in the scene, will be used for the laying of the green channel.
Riverside Road in the vicinity of the new South Gate, part of the road along the Green Road has Qi Hao. Although some roads are still digging, but the overall outline of the Green Road was revealed.
Features two bridges across the nine
Along the line of Binjiang Road, Jinjiang health Green Road, across the nine major bridges, which are water River Bridge, Huanhuaxi South Gate Bridge, beautiful bridge, Xian Qiao Wang, Baihua Tan Bridge, Jin Guan Qiao, Hongqiao, the South River Bridge , the old South Gate Bridge. According to the plan, the two bridges will be formed between the independent small ring, small ring connected to become big Link.
It is understood that, just 5.5 km of the Green Road, Binjiang Road, the health demonstration project, will form the interface of 5 Slow Link - Huanhuaxi Link and Link Cultural Park, Baihua Tan Link, Temple Link, People's Park lane width Link.
Hydrophilic characteristics of the corridor Hejiangting 3
As the core area of Binjiang Road, Chengdu, landscape Avenue, before the completion of the road from the old south gate to the Jiuyanqiao the renovation will involve the construction of the Green Road, Jinjiang side of the green building and landscape upgrades.
Riverside Road in the implementation of landscape transformation sub-3: Section of the old South Gate Bridge to Jinjiang transformation; Jin Jiang New South Gate Bridge to the Reconstruction; new south gate to the Reconstruction Jiuyanqiao. At present, the side is built Hejiangting "water corridor" - highlights 2.5-3 meters in the river corridor, it will be the largest water platform of Chengdu, where passers-by when, and Jin Jiang "close contact", the hydrophilic platform will be completed by the end of April.
South Gate to the old model into a paragraph Jiuyanqiao
Health Plan Riverside Road, West Green Road, water from the River Bridge Road east to climb up a total length of 13 km. Among them, the demonstration from the old South Gate to Jiuyanqiao length of 5.5 km. Upon completion, Huanhuaxi Park, Du Fu Thatched Cottage, Baihua Tan Park, Temple, People's Park, Hejiangting, Wangjiang Park and other attractions, will be connected in series through the green channel.
4 Green Road, Binjiang Road, a large health system
Fitness trail system: the full use of existing large trees along the fitness set and 2 meters wide trail system.
Water platform corridor system: to create a variety of waterfront space.
Bicycle Link Tour system: parallel and fitness trails, bike parking along the set number of points.
Integrated service system: setting in along the bathroom, set in a certain radius service kiosks. Photo Post reporter Li Qing Wei Fang Cheng Shunjiang Road extension workers from the April transformation
In addition, as construction of Riverside Road, Green Road, the extension of comprehensive improvement along the river road reconstruction project will start in the end of April.
Comprehensive transformation of the road Green Road Binjiang Road will continue the design concept, create a set of traffic, the urban landscape as one of the "ecological green lung" and the Green Lounge. Comprehensive treatment along River Road Improvement Project: First Ring Road Jiuyanqiao north, south fork in three court officers, is about 1600 meters; modified to "water culture" as the keynote.
Also included in the comprehensive improvement of traffic Jiuyanqiao Green, Pride primary junction plaza, the Air Force hospital family wings street green, dragon boat stands Plaza 8 nodes.
Source: Tianfuzaobao
According to the construction announcements, Riverside Road, Healthy Green Road will be completed by the end of 4.
Features a quartzite floor tiles Ginkgo
Green Road, Binjiang Road health plan was finalized last year, to the construction from the start, has always been of concern.
Yesterday afternoon, reporters from the old South Gate Bridge on foot to the Binjiangxilu, Binjiang Road, Jinjiang side of being hit around by the construction of Riverside Road from the direction to the Jiuyanqiao, Green Road, excavation and road construction in the road along the hermitages stage. Jinjiang in Binjiangxilu bridge, the road through the formation of excavation, but also a new tall ginkgo trees planted. Playing Weidang board, the quartzite tiles have just arrived in the scene, will be used for the laying of the green channel.
Riverside Road in the vicinity of the new South Gate, part of the road along the Green Road has Qi Hao. Although some roads are still digging, but the overall outline of the Green Road was revealed.
Features two bridges across the nine
Along the line of Binjiang Road, Jinjiang health Green Road, across the nine major bridges, which are water River Bridge, Huanhuaxi South Gate Bridge, beautiful bridge, Xian Qiao Wang, Baihua Tan Bridge, Jin Guan Qiao, Hongqiao, the South River Bridge , the old South Gate Bridge. According to the plan, the two bridges will be formed between the independent small ring, small ring connected to become big Link.
It is understood that, just 5.5 km of the Green Road, Binjiang Road, the health demonstration project, will form the interface of 5 Slow Link - Huanhuaxi Link and Link Cultural Park, Baihua Tan Link, Temple Link, People's Park lane width Link.
Hydrophilic characteristics of the corridor Hejiangting 3
As the core area of Binjiang Road, Chengdu, landscape Avenue, before the completion of the road from the old south gate to the Jiuyanqiao the renovation will involve the construction of the Green Road, Jinjiang side of the green building and landscape upgrades.
Riverside Road in the implementation of landscape transformation sub-3: Section of the old South Gate Bridge to Jinjiang transformation; Jin Jiang New South Gate Bridge to the Reconstruction; new south gate to the Reconstruction Jiuyanqiao. At present, the side is built Hejiangting "water corridor" - highlights 2.5-3 meters in the river corridor, it will be the largest water platform of Chengdu, where passers-by when, and Jin Jiang "close contact", the hydrophilic platform will be completed by the end of April.
South Gate to the old model into a paragraph Jiuyanqiao
Health Plan Riverside Road, West Green Road, water from the River Bridge Road east to climb up a total length of 13 km. Among them, the demonstration from the old South Gate to Jiuyanqiao length of 5.5 km. Upon completion, Huanhuaxi Park, Du Fu Thatched Cottage, Baihua Tan Park, Temple, People's Park, Hejiangting, Wangjiang Park and other attractions, will be connected in series through the green channel.
4 Green Road, Binjiang Road, a large health system
Fitness trail system: the full use of existing large trees along the fitness set and 2 meters wide trail system.
Water platform corridor system: to create a variety of waterfront space.
Bicycle Link Tour system: parallel and fitness trails, bike parking along the set number of points.
Integrated service system: setting in along the bathroom, set in a certain radius service kiosks. Photo Post reporter Li Qing Wei Fang Cheng Shunjiang Road extension workers from the April transformation
In addition, as construction of Riverside Road, Green Road, the extension of comprehensive improvement along the river road reconstruction project will start in the end of April.
Comprehensive transformation of the road Green Road Binjiang Road will continue the design concept, create a set of traffic, the urban landscape as one of the "ecological green lung" and the Green Lounge. Comprehensive treatment along River Road Improvement Project: First Ring Road Jiuyanqiao north, south fork in three court officers, is about 1600 meters; modified to "water culture" as the keynote.
Also included in the comprehensive improvement of traffic Jiuyanqiao Green, Pride primary junction plaza, the Air Force hospital family wings street green, dragon boat stands Plaza 8 nodes.
Source: Tianfuzaobao