From today, Mid-day holidays. Chengdu Traffic police said the three-day holiday traffic pressure on some of the roads within the city will continue, especially at the main road under construction. Which sections need to be cautious driving, and which sections of the construction, Huaxi Dushi Bao, specifically to provide you with the Travel Guide.
These sections of highway construction
Shanghai-Chengdu Expressway: affected by road construction, high-speed into the southern section of Shanghai-Chengdu 1783-1785.7 km section, the implementation of single two-way traffic; 1798.8-1800.8 km section of the main road closed construction; 1829.8 km section of high-speed construction of cotton by then, in the Take the road there are openings; 1812.5-1813.9 km road has construction. Chengdu to Nanchong direction ,1879.8-1800 km section, near Datong Station during the revetment construction.
Chengdu High-speed Ring: at 17:00 on September 23 before the outer 46-50 km of the Chengdu High-speed Ring, double closed between the airport construction, the implementation of the inner demi-way traffic.
Wenchuan Speed: Dujiangyan to Yingxiu implementation of traffic control, closed to traffic; Yingxiu to Dujiangyan, the direction of the implementation of intermittent traffic control clearance, please obey traffic command.
Should be within the high-speed: high speed within a desirable section of Yu-Kun 285-288 km section of the Jinsha River Bridge closed construction demi, demi-way traffic. Yibin section within the desirable direction to the water-rich, Bo Yang Wan Tunnel construction, the implementation of single two-way traffic.
Sichuan Expressway: By 30 September, at the Chengdu High-speed 124 km, Chengdu to Chongqing, the direction of slope maintenance, demi-way traffic. Sichuan Expressway 41-205 km, some sections of the construction to take two-way traffic demi paragraph by paragraph, or passage of time off road side points, please passing vehicles traffic prompted the construction site in strict accordance with traffic signs.
Cheng Ya-speed: September 23, Jingkun high speed into the direction of Ya Ya to the implementation section of Chengdu, demi construction, elegant movement into the direction of implementation of the demi, please Chengdu Pujiang direction to advance from the life of vehicles under the Road Safety toll bypass. Ya Ya to the Chengdu High-speed into the direction of 5-6 km, 184 km 750 meters road construction. Cheng Ya-speed 1916-1919 km, mountain road closed construction demi, demi-way traffic. Cheng Ya-speed 1916-1919 km, demi closed construction, demi-way traffic.
Into cotton wide high-speed: 1778 km into the cotton section of 380 meters to 1711 kilometers 880 meters, in Chengdu to Deyang white sections Bai Helin Pavement Maintenance and Repair, taking part of the lane. Cotton mill house to the Ling Guang River section of road maintenance and construction carried out during the day and two-way route through the unilateral passage of bilateral one-way traffic at night.
Ling Jiang, Guangyuan road off to the board, during the expansion construction, the road stopped the implementation of single two-way traffic, all the size of the buses is prohibited from entering Ling Jiang, paving the way to the kiln section, shall be from the local road crossing Guangyuan.
Guang Shan (Guang yuan to Shaanxi) Freeway expansion project under way, two-way traffic during construction demi, 5-axis (including 5-axis) or more and 20 tons (20 tons) or more of the truck closed to traffic. Small cars, small trucks and passenger cars, from the Chengdu-Mianyang, Guangyuan Guangzhou high-speed high-speed south to Guangyuan city bypass, take National Road 108 or State Road 213, then into the cotton from the north of Guangyuan Guangzhou high-speed high-speed.
Speed up Yu: December 31, at Chongqing expressway toll station to the River Luo Xujiaba 0-4 km of toll road construction to implement closed during construction, the original of all toll stations by Luo Jiang Yu speed out of the vehicle, according to the construction or detour signs to reach the nearest high-speed Xujiaba Yu toll down.
Barcelona High-Speed: Luzhou City, west to the Hu sections will promote the construction segment, the construction section of the implementation of demi closed, demi-way traffic.
O High-speed wide: National Day ago, Kwong Tung charging station construction to move stands, or from the need to Guang Guang friends on the high-speed driver, select out high-speed toll from Kwong.
Into the filling speed: Chong Yili cross Reconstructing ,28.4-30 .4 miles to implement two-way traffic control.
Chengdu city traffic conditions
City Centre:
Tianfu Square - Salt City Population: today's "No Car Day" during the event except to the west gate of the vehicle by Shudoutaidao, in passing the "heart" area, there are two routes to select: Go straight to the people by the general East Rd junction, turn right to go straight to the armed police Dongdan the door and turn left to the people of West Road, then went to Simon; by the total straight to the people of East Rd intersection, turn left into the Tianfu Square West Channel, turn right onto Royal Street and the West turn right to Dongcheng Gen Street west.
Riverside Road: In the August 1 to October 7 during the construction of Binjiang Road, the traffic control department to cancel the First Ring Road, Qingyang Gong road junction to the junction of the old bus lane and the outer Ring Road junction to the old road junction Shuinianhe within the bus lane outside. From east to west along the riverside road vehicles, the proposed multi-use "under the Lotus Pond Street - Wangjiaba Street - Hanny Road - New Bright Street," first-line conversion to the red screen wall, South Street Area; the first line of the East Gate Street, hon moving vehicles, in order to avoid crossing South Road, Southern Taiwan, the proposed Tianzhu Street ahead of the people in the small South junction conversion bypass.
East:
Niu Wangmiao: Metro Line 2 by the Chengdu Construction of Niu Wangmiao station, now a section of Kam Road in the one-way traffic, traffic police reminded the public to try to avoid the First Ring Road Niuwang Miao friend recently junction, more use of surrounding roads to detour to avoid the block. We may, by Shudoutaidao River Road along the eastern section of line or into the city; the original via East Avenue, Kam East line of vehicles out of the city, but also by Shudoutaidao out of town.
Cheng Hua Road: China's Road into three sections of the road during the current renovation construction, Chengdu University Avenue intersection to the entrance to the logistics demi closed construction, is expected to end by the end of September. Drive during the construction period by half, by the China Road and out of the city into a vehicle, the proposed selection Immortals Qiaodong advance by Balizhuang Road interchange to enter the Third Ring Road into a cotton bypass; or choose three out of the city loop interchange detour into the Southern to avoid the congested road.
Pride overpass: the Third Ring Road overpass East Side Pride, in the festivals prone to poor traffic. Suggested as possible to avoid the traffic police at 10 am to 12:30 hours and 17:30 hours assigned to the peak at 7. Huaxiang East Area attractions such as Trinity play to the people, choose the "East Avenue - East road - Jing Ming Road - Third Ring Space overpass - Yidu Avenue - Camphor Avenue - Jackie Chan Street" line and "Kam China Road - Interchange junction Third Ring Glass - Stone wins Road - Jackie Chan's Road "bypass line to avoid blocking.
South:
Cuqiao: September 30 Cuqiao streets, Cuqiao Backstreet closed construction, prohibit motor vehicle traffic. After construction of road access to the vehicles you can choose by the Sichuan-Tibet Road, Fu Kam Sec, Cuqiao in the street, clusters of Kam Road bypass.
Des Voeux Road Airport Expressway: the Chengdu airport expressway all the way into the city park benefits Koudao Voeux Road West Central Railway founding Qimao contact line, closed construction, prohibit motor vehicles, non-motor vehicles and pedestrians. Yi Yi Park, Park, a three-junction to the junction are closed construction to prohibit motor vehicle traffic. Vehicles entering the city via the airport expressway proposed main road or into a new large road bypass.
Story:
West Sheep: Chengdu Metro Line 2 west extension line 5 sites - West Welcome Road Station, Information Road Station, where the Golden Week mutual Way Road, Newport Road, where the foreign language schools, West Station Road will be closed where the Galaxy construction, construction period, the information in the information Road Station Road south of Park Road and mutual Road north of Golden Week, the south side of setting a sidewalk, pedestrians and non-motor vehicles can pass. Welcome Road Station, Foreign Language School Station, West Point and other sections of three sites where pedestrians and non-motorized vehicles prohibited. Vehicles and pedestrians via Welcome Road, Zhenxing Road, Jinke Road, Golden Grain Road, Baicao Road, Siege Road, Tian Chen Lu, DICON Boulevard bypass.
Western Hospital: Western Hospital, built in phases across the junction in the Second Ring Road overpass, take both ends of the junction of some lanes, established by the exchanges between the Second Ring Road Camp entrance direction of the vehicle crossing the Western Hospital, can only be straight, can not turn left into the city ; to the Second Ring Road from the junction Fuqin vehicles can be left, turn right to pass.
Shu Han Road: Construction of Shu Han Road, playing around. Recommended to avoid the traffic police, "Tongji West Street to the stream," congestion areas into the city from the west line sheep by Shu Han Road vehicles and the road → Yellow → with → East Court Street Bridge with good side streets → → Bridge with the Second Ring Road of good West Sec town.
North:
Chuan-Shan Road: Chuan-Shan Road, Three Ring Circle to the east demi road construction under way, the traffic police try to bypass North New roads to remind drivers, Shu Long Road and other roads to the north gate, avoiding the Sichuan-Shaanxi Road.
Wukuai Shi: Wu Kuaidan implement time-limited one-way traffic overpass: every day from 7 am to 9 pm, 5 pm to 7 pm, the implementation of two-way passage of vehicles; 9 am to 5 pm, Wukuai Dan Cross line of the bridge out of the city only allows passage of vehicles.
Li Dongyang Huaxi Dushi Bao Reporter
Jiangyou by car to the attention of Jiuzhaigou to the traffic control Pingwu
Landslides triggered by heavy rain, nine hours after the interrupt is open loop, the traffic police to remind: traveling by car during the holiday season around September as Link
Chengdu Business News (Xinhua Ling Wang Lei Haoran trainee journalist Juan) within the area round of heavy rain on the River is not obvious. Yesterday a reporter from the area learned of the situation in the province are "little local rainfall, there is no impact."
The evening of September 20 to September 21, Ping Wu Heavy heavy rain in most parts. Landslides triggered by heavy rains, mudslides, causing traffic was suspended nine ring, nearly a thousand vehicles stranded. After Pingwu traffic, traffic police and other multi-sectoral coordination, traffic was interrupted about 10 am yesterday reopened.
Mid-Autumn Festival, National Day two is coming, Pingwu remind the majority of occupants traffic police unit, although nine Link had reopened, but traffic is still relatively poor, as much as possible during the holiday season around September Zijia friends Link, at the same time learn more about the weather, travel conditions, during heavy rain a good way to select a road trip.
Since the earthquake, the Wenchuan to Jiuzhaigou in the land has not been to the tour "release." But there are still many great self-drive tourists will choose to go by car during the holidays Jiuzhaigou . The need to remind the faithful car: Provincial Tourism Bureau's official website yesterday, sending the message, according to Mianyang City, Mianyang City Department of Transportation and the Public Security Bureau yesterday issued notice to the nine Central Eastern Jiangyou Pingwu section is still in the high incidence of geological disasters, as prevent the occurrence of traffic accidents, Mianyang city government decided, the section of the traffic control was extended to October 31.
Highway traffic control section 205 for the line k51 +880 m to k250 +779 m (ie: the temple to Pingwu Jiangyou outlet with ABA at the junction of loess). During the traffic control to prohibit tourist bus, 40 or more (including 40) line of passenger cars and car classes total weight of 35 tons of cargo (including 35 tons) or more truck traffic. Conditions in other vehicles under the Road Traffic Police, traffic officers under the command of road traffic, and strict implementation of single inlet and double outlet (ie a single day can be entered Aba, Mianyang, two days by the Aba, Mianyang, entered the territory.) Control after 31 to 10, tour buses can access further notice.
Notice that the traffic control period, many along the way of a bad lot, the flood season comes, in the region between the passage of vehicles drive carefully, improve security and self-protection awareness and close observation of road traffic conditions. Source: Huaxi Dushi Bao