Reporter learned from the Provincial Communications Department, effective immediately, the implementation of Yingxiu to Wolong road traffic control, daily 6:00-12:00, down-bound traffic, that is, the direction of movement in Wolong to Yingxiu; 13:00-20:00, placed on moving vehicles , that is, to the Wolong Yingxiu access, banning all vehicle movement at night.
"8.14" large landslides caused by Provincial Road 303 washed reflect multiple horizontal road collapse, overwhelmed and buried, after 17 days of day and night repair, as of August 31, the initial rush through emergency rescue pavement. But because the tunnel to the South China Spa Resort longitudinal section of a large, curved anxious for soft and highly dangerous, poor access, to ensure safe and orderly passage of vehicles, Provincial Road 303 to the Wolong Town in Wenchuan County emergency traffic will be implemented control.
Lying in the road did not reflect back to normal before the passage, in addition to Wolong, Geng up and Yingxiu range SUV, below 5 tonnes truck load (half laden small truck) can pass, the remaining vehicles will be bypass, Do not overload. Source: Huaxi Dushi Bao